首页> 外文期刊>Power Technology and Engineering >HYDRAULIC LABORATORY VERIFICATION OF CONDITIONS FOR PASSAGE OF ANGARA FLOWS DURING CONSTRUCTION AND OPERATION OF THE BRATSK HYDROPROJECT
【24h】

HYDRAULIC LABORATORY VERIFICATION OF CONDITIONS FOR PASSAGE OF ANGARA FLOWS DURING CONSTRUCTION AND OPERATION OF THE BRATSK HYDROPROJECT

机译:布拉斯基水电站建设和运营过程中安加拉水流通过条件的液压实验室验证

获取原文
获取原文并翻译 | 示例
           

摘要

Results are presented for hydraulic laboratory investigations conducted by the VNIIG im. B. E. Vedeneeva to substantiate conditions for the passage of flows during construction and operation of the Bratsk hydroproject. Various alternate schemes for closure of the Angara River channel, conditions for the passage of water and ice through the narrow river channel, over the crest of the dam, through bottom and deep tubular construction discharges, and over a surface spillway are examined on there-dimensional models. Designs of the bottom and deep tubular construction discharges, and the operational spillway, as well as optimization of hydraulic losses in the water intake to the HPP and penstocks were worked out on fragmented models.
机译:结果由VNIIG im进行水力实验室研究。 B. E. Vedeneeva证实了布拉茨克水利枢纽建设和运营过程中水流通过的条件。在该处研究了各种替代方案,包括关闭安加拉河河道,水和冰通过狭窄河道,大坝顶部,底部和深层管状建筑排水口以及地面溢洪道的水流条件,尺寸模型。底部和深管结构排水口的设计,运行溢洪道以及对HPP和压力管道进水口的水力损失的优化是在分散模型上进行的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号