首页> 外文期刊>Power technology and engineering >INCREASING THE RELIABILITY OF THE SHUTDOWN OF 500-750-kV OVERHEAD LINES EQUIPPED WITH SHUNT REACTORS IN AN UNSUCCESSFUL THREE-PHASE AUTOMATIC REPEATED CLOSURE CYCLE
【24h】

INCREASING THE RELIABILITY OF THE SHUTDOWN OF 500-750-kV OVERHEAD LINES EQUIPPED WITH SHUNT REACTORS IN AN UNSUCCESSFUL THREE-PHASE AUTOMATIC REPEATED CLOSURE CYCLE

机译:在不成功的三相自动重复关闭循环中提高配备旁路电抗器的500-750 kV架空线的停机可靠性

获取原文
获取原文并翻译 | 示例
       

摘要

The reasons for circuit-breaker failures during repeated disconnection of 500 - 750 kV overhead lines with shunt reactors in a cycle of unsuccessful three-phase automatic reconnection (TARC) are analyzed. Recommendations are made for increasing the operating reliability of power transmission lines with shunt reactors when there is unsuccessful reconnection.
机译:分析了在不成功的三相自动重连(TARC)循环中用并联电抗器反复断开500-750 kV架空线时断路器故障的原因。当重新连接不成功时,建议增加带有并联电抗器的输电线路的运行可靠性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号