...
首页> 外文期刊>Power Technology and Engineering >IMPROVING THE INVESTMENT POTENTIAL OF THE EVENKIISKAYA HPP WHEN WORKING JOINTLY WITH HPPS OF THE VOLGA - KAMA CASCADE
【24h】

IMPROVING THE INVESTMENT POTENTIAL OF THE EVENKIISKAYA HPP WHEN WORKING JOINTLY WITH HPPS OF THE VOLGA - KAMA CASCADE

机译:与VOLGA-KAMA CASCADE一起使用HPPS时,增强EVENKIISKAYA HPP的投资潜力

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The capability is studied of improving the investment potential of the Evenkiiskaya HPP by using the power it generates in the United Power System of the European part of Russia by transitioning to a compensated electrical regime of water reservoir resource usage. A quantitative assessment of Evenkiiskaya HPP usage is presented using daily load demand. Increasing the guaranteed HPP power is proposed as an alternative to new nuclear power stations.
机译:通过转换为补偿性的水库资源使用电力制度,通过使用在俄罗斯欧洲部分的联合电力系统中产生的电力,研究了提高Evenkiiskaya HPP的投资潜力的能力。使用每日负荷需求对Evenkiiskaya HPP使用量进行了定量评估。建议增加保证的HPP功率,以替代新的核电站。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号