首页> 外文期刊>Power technology and engineering >STARTUP OF PUMPING UNITS IN PROCESS WATER SUPPLIES WITH COOLING TOWERS AT THERMAL AND NUCLEAR POWER PLANTS
【24h】

STARTUP OF PUMPING UNITS IN PROCESS WATER SUPPLIES WITH COOLING TOWERS AT THERMAL AND NUCLEAR POWER PLANTS

机译:在热电厂和核电厂使用冷却塔启动过程供水中的抽水机组

获取原文
获取原文并翻译 | 示例
       

摘要

Aspects of the startup of pumping units in the cooling and process water supply systems for thermal and nuclear power plants with cooling towers, the startup stages, and the limits imposed on the extreme parameters during transients are discussed.%National Research University 'Moscow State University of Civil Engi- neering,' Moscow, Russia;National Research University 'Moscow State University of Civil Engi- neering,' Moscow, Russia;National Research University 'Moscow State University of Civil Engi- neering,' Moscow, Russia;
机译:讨论了带有冷却塔的热电厂和核电厂的冷却和工艺给水系统中抽水机启动的各个方面,启动阶段以及瞬态过程中对极端参数施加的限制。国立工程大学,莫斯科,俄罗斯;国立研究大学,莫斯科国立工程大学,俄罗斯莫斯科;国立研究大学,莫斯科国立工程大学,莫斯科,俄罗斯;

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号