...
首页> 外文期刊>Power technology and engineering >HYDRAULIC REGIMES AND DOWNSTREAM SCOUR AT THE KAMA HYDROPOWER PLANT
【24h】

HYDRAULIC REGIMES AND DOWNSTREAM SCOUR AT THE KAMA HYDROPOWER PLANT

机译:卡玛水电站的液压系统和下游流量

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The article gives the results of investigating the hydraulic regime downstream of the concrete armoring of the lower pool combined with the surface spillways of the powerhouse of the Kama HPP. The investigations were carried out on physical and mathematical models as well as directly on-site. The investigations established the conditions under which occur the most unfavorable effects on elements of the riprap riverbed armor beyond the apron cutoff wall, at the base of the foundation slab of the right-bank abutment, and in the base of the right-bank slope of the tailrace channel, highest near- bottom flow velocities and wave heights during idle discharges, and characteristics of the eddy zone near the right bank. Recommendations on providing further safe operation of the HPP are given.
机译:这篇文章给出了调查下水池混凝土铠装下游的水力状况以及卡马HPP动力室表面溢洪道的结果。调查是在物理和数学模型以及直接在现场进行的。调查确定了在以下条件下,对围裙防渗墙以外,右岸基台基础板底部和右岸基岩坡基部的riprap河床装甲部件产生最不利影响的条件。尾水通道,空转时的最大近底流速和波高以及右岸附近的涡流带特征。给出了有关提供进一步安全操作HPP的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号