Purdue University's central utilities plant has four boilers that provide 710,000 1b/hr of saturated steam for power generation and heating. The plant also has two 40 MW steam turbines, five chillers, a cooling tower, air compressors and potable water wells. The initial decision to embark on a controls upgrade was driven by a desire to centralize and optimize control, boost reliability and to meet Y2K requirements. Upgrade of the control system is being carried out in stages, as funding becomes available. A contract systems integrator provided the initial control philosophy, programming and graphics.
机译:普渡大学的中央公用事业厂有四台锅炉,可为发电和供热提供710,000 1b / hr的饱和蒸汽。该工厂还拥有两台40兆瓦的蒸汽轮机,五台冷却器,一个冷却塔,空气压缩机和饮用水井。进行集中控制和优化,提高可靠性并满足Y2K要求的愿望决定了开始进行集中控制升级。随着资金的到来,控制系统的升级正在分阶段进行。合同系统集成商提供了初始控制原理,编程和图形。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号