首页> 外文期刊>Power Engineering >STACK LINING RETROFIT HAS THREE-YEAR PAYBACK
【24h】

STACK LINING RETROFIT HAS THREE-YEAR PAYBACK

机译:堆砌衬砌翻新已三年

获取原文
获取原文并翻译 | 示例
       

摘要

Like Many Power plants constructed in the early 1970s, Louisville Gas & Elec-tric's (LG&E). 2,000 MW Mill Creek coal-fired power plant was required to add a wet scrubbing systems to comply with EPA pol- lution control guidelines. As part of the wet scrubber installation a re-heater system was also installed. The re-heaters are designed for full flow heating of the treated flue gas prior to its release into the atmosphere. Unfortunately, the re-heater proved inefficient and reduced the plant's energy production by approximately three percent. In addition, the re-heater system resulted in continual maintenance problems from leaking tubes, and the flue gas left a sulfuric acid residue as it passed through the stack. Over a period of time this residue caused severe deterioration of the carbon steel linings in the plant's three 630-ft stacks.
机译:像1970年代初期建造的许多发电厂一样,路易斯维尔煤气与电力公司(LG&E)。要求2000 MW的Mill Creek燃煤电厂增加湿式洗涤系统,以符合EPA污染控制准则。作为湿式洗涤器安装的一部分,还安装了一个再热器系统。再热器设计用于在处理后的烟气释放到大气中之前对其进行全流加热。不幸的是,事实证明,再热器效率低下,工厂的能源生产减少了约3%。另外,再热器系统由于管道泄漏而导致持续的维护问题,烟道气在通过烟道时会留下硫酸残留物。在一段时间内,这种残留物使工厂的三个630英尺烟囱中的碳钢衬里严重恶化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号