首页> 外文期刊>Power Engineering >Texas Pushes Transmission Decision
【24h】

Texas Pushes Transmission Decision

机译:德州推动传输决策

获取原文
获取原文并翻译 | 示例
       

摘要

Already playing host to more wind generation than any other place in the United States, Texas is now grappling with how to get it to customers. And because it does not have enough transmission in the right places, wind project deployment in the state appears to be slowing. In October, the Public Utility Commission of Texas (PUC) urged a consortium of eight transmission companies to come to terms and decide who will do what and where with regard to building new transmission. The PUC set a hearing date in December and put pressure on parties to reach agreement before then.
机译:得克萨斯州已经比美国其他任何地方都产生了更多的风力发电,现在德克萨斯州正在设法将其发电给客户。而且由于它在正确的地方没有足够的传输,该州的风能项目部署似乎正在放缓。 10月,得克萨斯州公用事业委员会(PUC)敦促由八家输电公司组成的财团达成和解,并决定谁将在新输电方面做哪些工作。 PUC于12月设定听证会日期,并向各方施加压力,要求在此之前达成协议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号