首页> 外文期刊>Power Engineering >U.S. Geothermal Production Well Completed
【24h】

U.S. Geothermal Production Well Completed

机译:美国地热生产完工

获取原文
获取原文并翻译 | 示例
       

摘要

U.S. Geothermal Inc. said that well NHS-5, the second full-size production well at the Neal Hot Springs project in eastern Oregon, was successfully completed on October 15.rnNHS-5 encountered several lost circulation zones within the targeted horizon and intercepted a large aperture fracture at 2,796 feet resulting in a total loss of circulation. The well was completed to a depth of 2,896 feet. An initial 16-hour flow test completed using air lift produced fluid at a rate of 1,500 gallons per minute and resulted in a down hole flowing temperature of 286 F (141 C).
机译:美国地热公司表示,NHS-5井是俄勒冈州东部Neal Hot Springs项目的第二座全尺寸生产井,已于10月15日成功完工。NHS-5井在目标层位范围内遇到几个漏失区域,并拦截了一个2796英尺处的大孔径裂缝导致血液循环完全丧失。该井已完工至2,896英尺的深度。最初的16小时流量测试使用气举完成,以1,500加仑/分钟的速度产生的流体导致井下流动温度为286 F(141 C)。

著录项

  • 来源
    《Power Engineering》 |2009年第11期|76|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:26:53

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号