首页> 外文期刊>Power Engineering >Expecting More from the Nuclear Fleet
【24h】

Expecting More from the Nuclear Fleet

机译:期待核舰队更多

获取原文
获取原文并翻译 | 示例
       

摘要

From welds to valves to concrete floors, nuclear power plants are beginning to show their age. At the same time, plant owners are hoping to extend their plants' operating lives. High-profile projects performed during scheduled outages like turbine or steam generator replacements are marvels of engineering and scheduling prowess. But the less glamorous balance-of-plant (BOP) systems also need constant attention.rnIn April, the Nuclear Regulatory Commission (NRC) approved a 20-year operating license extension for Oyster Creek Generating Station, the oldest nuclear power plant in the U.S. In late August, plant operators removed a 25-foot section of underground pipe that was leaking inside the turbine building, close to where two smaller leaks had been discovered months before.Station operators continue to inspect pipes in the affected area as part of the site's aging management program.
机译:从焊缝到阀门再到水泥地面,核电站已开始显示其寿命。同时,工厂所有者希望延长工厂的使用寿命。在计划内停机期间进行的备受瞩目的项目,例如涡轮机或蒸汽发生器的更换,是工程和计划能力的奇迹。但是,魅力四射的植物平衡系统(BOP)也需要不断关注。rn4月,核监管委员会(NRC)批准了美国最古老的核电厂Oyster Creek发电站的20年经营许可证延期。 8月下旬,工厂操作员拆除了涡轮机建筑物内泄漏的25英尺长的地下管道部分,靠近几个月前发现两个较小泄漏点的地方。电站操作员继续检查受灾地区的管道,作为现场的一部分老化管理程序。

著录项

  • 来源
    《Power Engineering》 |2009年第10期|323537-38|共4页
  • 作者

    Nancy Spring;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:26:56

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号