首页> 外文期刊>Power Engineering >B&W Plans a New Nuclear Power Reactor
【24h】

B&W Plans a New Nuclear Power Reactor

机译:B&W计划建造新的核电反应堆

获取原文
获取原文并翻译 | 示例
           

摘要

The Babcock & Wilcox Co. plans to deploy a scalable Advanced Light Water Reactor that can be installed in increments of 125 MW. The plant would have a five-year operating cycle between refueling and an overall 60-year lifespan.rnB&W told the NRC it plans to submit an application in 2011 for the reactor's design certification.rnIn addition, B&W said it received a Letter of Intent from Tennessee Valley Authority to begin evaluating a potential lead plant site for the B&W "mPower" reactor. A Memorandum of Understanding was signed by B&W, TVA and a consortium of regional municipal and cooperative utilities to explore building a fleet of the reactors to meet the consortium's need to diversify its power generation assets.
机译:Babcock&Wilcox公司计划部署可扩展的先进轻水反应堆,该反应堆可以以125 MW的增量安装。该工厂将在加油和整个使用寿命之间有五年的运行周期。rnB&W告诉NRC,它计划在2011年提交该反应堆设计认证的申请。rn此外,B&W表示已收到来自该反应堆的意向书。田纳西河谷管理局将开始评估B&W“ mPower”反应堆的潜在铅厂场址。 B&W,TVA和区域市政与合作公用事业财团签署了谅解备忘录,以探讨建设反应堆车队以满足财团将其发电资产多样化的需求。

著录项

  • 来源
    《Power Engineering》 |2009年第7期|54-54|共1页
  • 作者

    David Wagman;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号