首页> 外文期刊>Power Engineering >Steel Winds Overcomes Installation Problems
【24h】

Steel Winds Overcomes Installation Problems

机译:钢风克服了安装问题

获取原文
获取原文并翻译 | 示例
           

摘要

The Steel Winds project launched in the middle of 2007 under a blaze of publicity. What made it so newsworthy was that it was among the first urban wind farms and the first built on a brownfield site on what was once the famous Bethlehem Steel Mill onrnthe shores of Lake Erie near Buffalo, N.Y. And it was the first site in the world to deploy the Liberty wind turbine, one of the largest built in the U. S. at the time. The eight units installed at the project were the first products to come off the assembly line of wind turbine manufacturer Clipper Windpower of Carpinteria, Calif.
机译:钢铁之风(Steel Winds)项目于2007年年中在宣传下启动。它之所以如此具有新闻价值,是因为它是最早的城市风电场之一,并且是在原先位于纽约州布法罗附近伊利湖沿岸著名的伯利恒钢铁厂的棕地上建造的,它是世界上第一个风电场。部署Liberty风力涡轮机,这是当时美国最大的风力涡轮机之一。该项目安装的八个单元是加利福尼亚州卡平特里亚的风力涡轮机制造商Clipper Windpower下线的首批产品。

著录项

  • 来源
    《Power Engineering》 |2009年第7期|2830|共2页
  • 作者

    Drew Robb;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号