首页> 外文期刊>Power Engineering >Meeting the Training and Education Challenge
【24h】

Meeting the Training and Education Challenge

机译:应对培训和教育挑战

获取原文
获取原文并翻译 | 示例
       

摘要

This autumn is shaping up as a busy one for many of North America's nuclear power plants. Almost three dozen refueling outages are scheduled for the fall, along with three steam generator and one reactor head replacement. The industry also must implement a personnel fatigue rule by October 1, which may require additional staffing. And significant upgrade projects are underway at Canadian and European nuclear facilities.rnFor radiation specialists, many of whom work during nuclear power plant outages, all of this represents good news. "We're looking at 200 to 300 people; that's huge," said Jerry Hiatt, chief technical officer and certified health physicist with Bartlett Nuclear, which provides supplemental staffing for nuclear outages. But radiation staffing resources are also largely maxed out, meaning as many as 50 positions could go unfilled.
机译:对于北美许多核电厂而言,今年秋天正成为繁忙的一年。计划在秋天进行近三十二次加油中断,并更换三台蒸汽发生器和一台反应堆头。行业还必须在10月1日之前实施人员疲劳规则,这可能需要额外的人员。加拿大和欧洲的核设施正在进行重大的升级项目。对于辐射专家而言,其中许多人在核电站停工期间工作,这一切都是好消息。 Bartlett Nuclear首席技术官兼认证健康物理学家Jerry Hiatt说:“我们正在寻找200至300人;这是巨大的。”该公司为核事故提供补充人员。但是,辐射人员的资源也在很大程度上被用尽,这意味着多达50个职位可能无法填补。

著录项

  • 来源
    《Power Engineering》 |2009年第6期|3840|共2页
  • 作者

    David Wagman;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:26:54

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号