首页> 外文期刊>Power Engineering >ERA'S Second, Watery Front
【24h】

ERA'S Second, Watery Front

机译:ERA的第二,水面战线

获取原文
获取原文并翻译 | 示例
       

摘要

EPA is preparing to battle utilities on a second front. This time it's a water assault (as opposed to an air assault) using Section 316(b) of the Clean Water Act (CWA). EPA's regulations implementing this simple section of the Act have been litigated up to the Supreme Court and back again.rnSection 316(b) states:rn"Any standard established pursuant to section 301 or section 306 of this Act and applicable to a point source shall require that the location, design, construction, and capacity of cooling water intake structures reflect the best technology available for minimizing adverse environmental impact."
机译:EPA正准备在第二方面与公用事业作战。这次是使用《清洁水法》(CWA)第316(b)条进行的水攻击(而不是空中攻击)。 EPA实施该法这一简单部分的法规已向最高法院提起诉讼。rn第316(b)节规定:rn“根据本法第301条或306条制定的,适用于点源的任何标准均应适用。要求冷却水进水口结构的位置,设计,构造和容量应能反映出可用于最大程度减少对环境的不利影响的最佳技术。”

著录项

  • 来源
    《Power Engineering》 |2009年第6期|8-8|共1页
  • 作者

    Robynn Andracsek;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:26:54

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号