首页> 外文期刊>Power Engineering >Projects & Contracts
【24h】

Projects & Contracts

机译:项目与合同

获取原文
获取原文并翻译 | 示例
       

摘要

Entergy Nuclear said it will temporarily suspend reviews of two new nuclear license applications and will explore alternative nuclear technologies. The company asked the Nuclear Regulatory Commission to suspend reviews specific to GE Hitachi's Simplified Boiling Water Reactor after what it said were unsuccessful attempts to agree on business terms. Entergy Nuclear will also temporarily defer environmental reviews for the construction and operating license applications for potential projects at its nuclear sites in Grand Gulf, near Port Gibson, Miss., and River Bend, near St. Francisville, La.
机译:Entergy Nuclear表示将暂时中止对两个新核执照申请的审查,并将探索替代性核技术。该公司要求核监管委员会暂停对通用电气日立公司的简化沸水反应堆的审查,因为该公司称未能就商业条款达成协议。 Entergy Nuclear还将临时推迟对密西西比州吉布森港附近的大海湾核电站和密西西比州圣弗朗西斯维尔附近的本德河核电站潜在项目的建设和运营许可证申请进行环境审查。

著录项

  • 来源
    《Power Engineering》 |2009年第2期|p.1416|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 各种发电;能源与动力工程;
  • 关键词

  • 入库时间 2022-08-18 00:26:50

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号