In 2007 Alstom announced their plans to build a new manufacturing facility in Chattanooga, Tenn. to produce turbines for fossil fuel and nuclear power plants. After almost three years, the 350,000 square foot facility opened its doors on June 24th to begin manufacturing steam turbines, gas turbines, generators and related equipment for use in North American power generation facilities. The facility will also retrofit existing turbines with new technology. But before construction on the expansion of the existing site could begin, the French-based company had to re-configure their campus to erect the facility.
机译:2007年,阿尔斯通宣布了他们在田纳西州查塔努加建立新制造厂的计划,以生产用于化石燃料和核电站的涡轮机。经过近三年的发展,这座占地350,000平方英尺的工厂于6月24日开业,开始生产用于北美发电设施的蒸汽轮机,燃气轮机,发电机和相关设备。该工厂还将用新技术改造现有的涡轮机。但是在开始扩建现有场地之前,这家总部位于法国的公司不得不重新配置其校园以架设该设施。

著录项

  • 来源
    《Power Engineering》 |2010年第8期|P.1416|共2页
  • 作者

    Brian Wheeler;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:26:18

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号