首页> 外文期刊>Power Engineering >The Next Generation of Steam Plant Controls
【24h】

The Next Generation of Steam Plant Controls

机译:下一代蒸汽设备控制

获取原文
获取原文并翻译 | 示例
       

摘要

The increase in energy-only resources is placing additional demands on traditional methods for energy production such as steam cycle generation. These new demands include meeting profitability goals, environmental constraints, and different types of production schedules that may not have been envisioned by the original designers of the steam plant. Optimizing the plant still implies running the plant at maximum efficiency with no wasted fuel, but adds new emphasis on operating consistently without unplanned outages. It also requires maximizing profitability by running the plant according to changing production schedules or derates, which are based on external conditions such as the attempt to integrate more energy-only renewable resources. Given the tools that are deployed at most steam plants today, there is a clear need for increased operational insight and advanced control to meet these challenges.
机译:纯能源的增加对传统的能源生产方法(如蒸汽循环发电)提出了更多要求。这些新的需求包括满足盈利目标,环境限制以及蒸汽厂原始设计人员可能未想到的不同类型的生产计划。优化工厂仍然意味着在不浪费燃料的情况下以最大效率运行工厂,但是增加了对持续运行而不造成计划外停机的新重点。它还需要通过根据不断变化的生产计划或降额来运行工厂来最大化利润,这取决于外部条件,例如尝试整合更多纯能源的可再生资源。鉴于当今大多数蒸汽工厂已部署了这些工具,显然需要增强运营洞察力和先进控制能力,以应对这些挑战。

著录项

  • 来源
    《Power Engineering》 |2011年第9期|p.1820222426|共5页
  • 作者

    Bill Pezalla;

  • 作者单位

    Global Industry Manager Electric Utilities, GE Intelligent Platforms;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:26:02

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号