首页> 外文期刊>Power Engineering >Overcoming Obstacles at Plum Point
【24h】

Overcoming Obstacles at Plum Point

机译:克服李子点的障碍

获取原文
获取原文并翻译 | 示例
       

摘要

In August 2010, the Plum Point Energy Station started commercial operations. Over the course of four years, engineers, construction workers and five owner participants overcame numerous hurdles to complete the 665 MW coal-fired power plant. Recognizing a need for power in the South and Midwest, the Plum Point En- ergy Associates (which now consists of Dynegy, the Missouri Joint Municipal Electric Utility Commission, Empire District Electric Co., East Texas Electric Cooperative and the Municipal Energy Agency of Mississippi) in 2006 signed a fixed lump sum engineering, procurement and construction contract for the plant with the EPC contractor, Plum Point Power Partners.
机译:2010年8月,梅花角能源站开始商业运营。在过去的四年中,工程师,建筑工人和五名业主参与者克服了众多障碍,完成了665兆瓦的燃煤电厂。 Plum Point能源协会(现已由Dynegy,密苏里州市政电力联合委员会,Empire District Electric Co.,东德克萨斯电力合作社和密西西比市市政能源机构组成)认识到南部和中西部地区对电力的需求, )在2006年与EPC承包商Plum Point Power Partners签订了固定的一次性总价工程,采购和建设合同。

著录项

  • 来源
    《Power Engineering》 |2011年第1期|p.12|共1页
  • 作者

    Brian Wheeler;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:26:01

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号