Loss of Navajo coal-fired plant could cost $18bn

机译:纳瓦霍燃煤电厂的损失可能造成180亿美元的损失

获取原文
获取原文并翻译 | 示例
       

摘要

A study prepared by Arizona State University on behalf of the Salt River Project and the Navajo Nation says the loss of the Navajo generating station in northern Arizona would cost the state approximately $18 billion. The 2,250 MW Salt River Project-operated coal-fired station employs about 540 people, more than 80 percent of whom are Native American. The plant's lease and various rights of way with the Navajo Nation are set to expire around 2019 and the NGS owners are currently negotiating extensions.
机译:亚利桑那州立大学代表盐河项目和纳瓦霍民族组织进行的一项研究表明,亚利桑那州北部纳瓦霍发电站的损失将使该州损失约180亿美元。由盐河项目运营的2,250兆瓦燃煤电站拥有约540名员工,其中80%以上是美国原住民。 Navajo Nation工厂的租赁权和各种通行权定于2019年左右到期,NGS所有者目前正在谈判延期。

著录项

  • 来源
    《Power Engineering》 |2012年第3期|p.68|共2页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:25:33

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号