首页> 外文期刊>Power Engineering >The Opportunity Gap in Economic Load Response
【24h】

The Opportunity Gap in Economic Load Response

机译:经济负荷响应中的机会差距

获取原文
获取原文并翻译 | 示例
       

摘要

Recently, PJM released an anal- ysis, entitled '2012 Economic Demand Response Performance Report', of its implementation of FERC Order 745. Order 745 directed Independent System Operators to create a mechanism for paying a demand response resource the Locational Marginal Price (LMP) at its location for curtailed load whenever the hourly price is above a "Net Benefits" threshold. In only five months after PJM implemented the order in April 2012, the volume of energy that was curtailed for this program was about equal to the volume that had been curtailed over the previous three and a half years.
机译:最近,PJM发布了关于其FERC 745号订单实施情况的分析报告,名为“ 2012年经济需求响应绩效报告”。745号订单指示独立系统运营商创建一种机制,用于向需求响应资源支付位置边际价格(LMP)只要每小时价格高于“净收益”阈值,就可以在其位置减少负荷。在PJM于2012年4月实施该命令后仅五个月,该计划削减的能源量大约等于过去三年半削减的能源量。

著录项

  • 来源
    《Power Engineering》 |2013年第7期|10-10|共1页
  • 作者

    RICHARD FUSCO;

  • 作者单位

    JOULE ASSETS INC.;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:25:14

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号