Bob Williams, TVA's Watts Bar Fu-kushima project manager, was in a tight spot in August 2012 when the U.S. Nuclear Regulatory Commission issued its orders concerning nuclear plant modifications in response to the Fuku-shima Daiichi accident. Construction of TVA's new nuclear plant, Watts Bar Unit 2, was well underway when Fukushima happened. The NRC order required operating plants to be in compliance within two operating cycles, but required construction permit plants like Watts Bar 2 to be in compliance before receiving an operating license. So while the existing Watts Bar Unit 1 would need to be in compliance by October 2015, Unit 2 had to get there by early Fall 2014.
机译:TVA的Watts Bar Fu-kushima项目经理Bob Williams在2012年8月处于紧要关头,当时美国核管理委员会发布了有关福岛第一核电站事故的核电站改造命令。福岛事故发生时,TVA的新核电站Watts Bar Unit 2的建设进展顺利。 NRC订单要求运营工厂在两个运行周期内达到合规要求,但要求诸如Watts Bar 2之类的施工许可工厂在获得运营许可证之前必须合规。因此,尽管现有的Watts Bar Unit 1需要在2015年10月之前达到合规要求,但Unit 2必须在2014年秋季初到达那里。

著录项

  • 来源
    《Power Engineering》 |2014年第11期|12-12|共1页
  • 作者

    BRIAN SCHIMMOLLER;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号