首页> 外文期刊>Power Engineering >Successful Coal Ash Pond Management
【24h】

Successful Coal Ash Pond Management

机译:成功的粉煤灰池塘管理

获取原文
获取原文并翻译 | 示例
       

摘要

Regulatory requirements, plant retirements, changes to facility operational pro- files,environmental li- ability management and political and social pressures are among the factors driving utilities to close or consider closing their coal ash ponds. The process can be time-intensive and costly -- and fraught with uncertainties. Success requires careful attention to upfront analysis and strategic decision making as well as proper implementation and sequencing of all the regulatory, contractual, land use, and community issues contained in the selected solution(s). Facilities will need to plan their activities to take into account operational changes, regulatory impacts and long term land use issues. It is advantageous to know and anticipate environmental issues upfront to avoid expensive backtracking and delays.
机译:法规要求,工厂报废,设施运行配置文件的变更,环境责任管理以及政治和社会压力都是促使公用事业公司关闭或考虑关闭其煤灰池的因素。该过程可能耗时且成本高昂,并且充满不确定性。成功需要仔细注意前期分析和战略决策,以及对选定解决方案中包含的所有法规,合同,土地使用和社区问题的正确实施和排序。设施将需要计划其活动,以考虑到运营变化,法规影响和长期土地使用问题。事先了解和预测环境问题,以避免昂贵的回溯和延误,是有利的。

著录项

  • 来源
    《Power Engineering》 |2014年第7期|34-39|共6页
  • 作者

    MARK JOHNSON; KENT NILSSON;

  • 作者单位

    TRC COMPANIES INC;

    TRC COMPANIES INC;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:24:44

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号