History 8 Challenges of a Successful NOx Reduction Project

机译:历史8成功减少NOx项目的挑战

获取原文
获取原文并翻译 | 示例
       

摘要

The Edgewater SCR project team faced significant challenges in designing an SCR system that would preserve the operational flexibility of the existing unit after the SCR was installed. By identifying the criteria that would preserve this flexibility during the design phase and carrying it over to the construction phase, the project team was successful in achieving this objective. Involvement of plant operations during the early design phases of the project, integrating WPL's project team members with team members from the OEM, Constructor and startup and commissioning team along with the support of the Owner's Engineer were key elements in the successful achievement of the project scope in time for compliance and within budget.
机译:Edgewater SCR项目团队在设计SCR系统时面临重大挑战,该系统将在安装SCR后保留现有机组的操作灵活性。通过确定在设计阶段保留这种灵活性的标准并将其延续到建设阶段,项目团队成功实现了这一目标。在项目的早期设计阶段参与工厂运营,将WPL的项目团队成员与OEM,构造商,启动和调试团队的成员整合在一起,并在业主工程师的支持下,是成功实现项目范围的关键要素及时合规并在预算之内。

著录项

  • 来源
    《Power Engineering》 |2014年第3期|30-323436-44|共13页
  • 作者单位

    WISCONSIN POWER AND LIGHT;

    WISCONSIN POWER AND LIGHT;

    HDR ENGINEERING;

    HDR ENGINEERING;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:24:45

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号