首页> 外文期刊>Power Engineering >Outage Management 101: Identify, Plan, Execute, Review
【24h】

Outage Management 101: Identify, Plan, Execute, Review

机译:中断管理101:确定,计划,执行,检查

获取原文
获取原文并翻译 | 示例
       

摘要

The moment a plant or unit comes out of service for an outage, it stops generating revenue for its owner and starts racking up expense. The economic impact of poorly planned and executed outages can be severe. The loss of availability or capacity due to outage extensions or later reworks cuts into your annual return swiftly and dramatically. To effectively prepare for and execute your outage - and rein in on unexpected costs and schedule slippage - you need a clearly defined outage management process built on four pillars: Identify, Plan, Execute, Review.
机译:工厂或单位因停运而停止服务时,将停止为其所有者产生收入并开始增加费用。计划不当和执行不力的停机对经济的影响可能是严重的。由于中断扩展或以后的返工导致的可用性或容量损失迅速而显着地减少了您的年收益。为了有效地准备和执行中断-并控制意外成本和计划延误-您需要基于四个支柱的明确定义的中断管理流程:识别,计划,执行,检查。

著录项

  • 来源
    《Power Engineering》 |2015年第11期|464850-52|共5页
  • 作者

    ROB BROGLIO; HENRY SCHECK;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:24:29

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号