首页> 外文期刊>Power Engineering >Piping Prefab: Boosting Efficiency with Grooved Systems
【24h】

Piping Prefab: Boosting Efficiency with Grooved Systems

机译:管道预制件:带槽系统提高效率

获取原文
获取原文并翻译 | 示例

摘要

According to the Government Accountability Office, just over 42 GW or about 13 percent of coal-fired capacity has been retired since 2012 or is planned for retirement by 2025. The coming years will bring a boom in gas-fired plant construction as power producers rush to replace the retiring units. Indeed, there are currently more projects in the planning and design stage than we've seen in the last 15 years. With so much capacity to replace in a small window, strategies that reduce construction time will be vital, and the availability of skilled labor will be critical.
机译:根据政府问责办公室的说法,自2012年以来,已经淘汰了超过42吉瓦,约占燃煤发电量的13%,或计划在2025年之前退休。随着发电商的涌入,未来几年燃煤电厂建设将蓬勃发展更换退役单位。实际上,目前在规划和设计阶段的项目比过去15年要多。由于在一个小窗口中具有如此大的替换能力,因此减少施工时间的策略至关重要,而熟练工人的可用性也至关重要。

著录项

  • 来源
    《Power Engineering》 |2015年第4期|4649|共2页
  • 作者

    BILL LOWAR;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号