首页> 外文期刊>Power Engineering >Using Temporary Cooling Systems
【24h】

Using Temporary Cooling Systems

机译:使用临时冷却系统

获取原文
获取原文并翻译 | 示例
       

摘要

Many plants rely on river or lake water for their condenser and equipment cooling and must ensure that discharge water stays within certain temperature limits. Problems with reduced river flows and lake levels and increased intake temperatures mean that plants are having to reduce load to meet discharge temperature requirements. The alternative is to use temporary cooling towers. Aggreko LLC operated five thermal discharge projects at power plants during the summer of 2008. Discharge water from the plant is passed through the cooling towers for cooling and is then released into the river or lake. With modern data recording systems, it is relatively easy to document system performance, Btu removal and system run time, which helps to verify cost-benefit models as well as satisfy regulating bodies or inspectors. A variety of cooling water manufacturers and rental companies can provide temporary systems. Choices range from companies with full engineering staffs and project managers to companies that simply provide equipment.
机译:许多工厂依靠河水或湖水来冷凝器和设备进行冷却,必须确保排放水保持在一定温度范围内。河流流量减少和湖泊水位下降以及进水温度升高的问题意味着工厂必须降低负荷以满足排放温度的要求。替代方法是使用临时冷却塔。 Aggreko LLC在2008年夏季在电厂运行了五个热力排放项目。该设备的排放水通过冷却塔进行冷却,然后释放到河流或湖泊中。使用现代数据记录系统,相对容易地记录系统性能,Btu移除和系统运行时间,这有助于验证成本效益模型并满足监管机构或检查人员的要求。各种冷却水制造商和租赁公司都可以提供临时系统。选择范围从具有完整工程人员和项目经理的公司,到仅提供设备的公司。

著录项

  • 来源
    《Power Engineering》 |2009年第11期|p.40-42|共3页
  • 作者单位

    By Bob Ferrante and Patrick Williams, Aggreko LLC;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 13:45:29

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号