首页> 外文期刊>Power Engineering >Operating the Old While Building the New
【24h】

Operating the Old While Building the New

机译:在建造新建筑物的同时经营旧建筑物

获取原文
获取原文并翻译 | 示例
       

摘要

The Comanche Station in Pueblo, CO, has overcome the unique challenge of managing a two-unit baseload coal plant while adding a 750 MW unit and constructing major environmental retrofits. The new supercritical coal-fired unit goes into service in December. Comanche Unit 3's supercritical boiler is provided by Alstrom and the turbine generator is from Mitsubishi. Public Service Co agreed with its union that operations personnel for the new and the old units would be separate through commissioning and probably through the first year of operation. In short, the Comanche Peak project represents the ultimate in power plant operation multi-tasking.
机译:科罗拉多州普韦布洛的Comanche站克服了管理两台基本负荷燃煤电厂,增加750兆瓦机组并进行重大环境改造的独特挑战。新的超临界燃煤机组于12月投入使用。 Alman提供科曼奇3号机组的超临界锅炉,涡轮发电机来自三菱。公共服务公司同意其工会的意见,即通过调试以及可能在运营的第一年,将新老单位的运营人员分开。简而言之,科曼奇峰项目代表了电厂运行多任务处理的终极目标。

著录项

  • 来源
    《Power Engineering》 |2009年第10期|p.28-28|共1页
  • 作者

    Steve Blankinship;

  • 作者单位

    By Steve Blankinship, Associate Editor;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 13:45:26

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号