Despite a sagging economy and lowered electric demand, the power must stay on. That means repairs and upgrades to fossil power generation fleet continue. Some are small and intended to meet short-term needs. By some definitions, small fixes can include heaters, super heaters, reheaters and small economizers. Turbine generators upgrades in some cases are needed to compensate for the additional parasitic load these environmental systems draw. Today's turbine technology can easily add additional capacity, reliability and increase the time between inspection. When uprating a coal plant steam turbine/generator, the generator must be analyzed to determine what the additional load will be. Generators often need rewinding once they reach about 40 years in age. Most generators were designed to run 30 to 40 years. Today, power asset owners are trying to run them another 20 or 30 years. Condensers represent another major coal plant component replacement that becomes necessary after two or three decades of service.
机译:尽管经济不景气,电力需求下降,但电力必须保持接通。这意味着将继续对化石发电车队进行维修和升级。有些很小,旨在满足短期需求。根据某些定义,小型修补程序可以包括加热器,过热器,再热器和小型省煤器。在某些情况下,需要对涡轮发电机进行升级,以补偿这些环境系统带来的额外寄生负载。当今的涡轮技术可以轻松地增加容量,可靠性并延长检查间隔。在升级燃煤电厂的蒸汽轮机/发电机时,必须分析发电机以确定额外的负荷。发电机寿命大约40年后,通常需要重绕。大多数发电机设计为可运行30至40年。如今,电力资产所有者正在尝试将它们再运行20年或30年。冷凝器代表着另一座主要的燃煤电厂部件更换,在服务两三年或三十年后,这是必要的。

著录项

  • 来源
    《Power Engineering》 |2009年第8期|p.34-38|共5页
  • 作者

    Steve Blankinship;

  • 作者单位

    By Steve Blankinship, Associate Editor;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 13:45:29

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号