A major issue within the renewable energy industry cuts to the heart of where renewables will be a decade or two from now. The issue is how to make renewables from the grid available to all utility customers nationwide at a competitive price. The Federal Energy Regulatory Commission can intervene in citing only if a state rejects a transmission project within an existing right of way. Recent discussions on Capitol Hill aimed at boosting federal authority to site transmission lines showed the fight will not be based along party lines as much as upon regional differences. Reaching agreement on all this will prove difficult at best. There's no need to hold your breath over this one.
机译:可再生能源行业的一个主要问题触及到可再生能源将在未来一两年内发展的中心。问题是如何以具有竞争力的价格向全国所有公用事业客户提供电网可再生能源。只有当州拒绝在现有通行权范围内的输电项目时,联邦能源监管委员会才能进行干预。最近在国会山上进行的旨在增强联邦政府对输电线路的选址的讨论表明,这场斗争不会像在党派路线上那样多地基于地区差异。在所有这些方面达成共识最多将是困难的。无需屏住呼吸。

著录项

  • 来源
    《Power Engineering》 |2009年第6期|p.12-12|共1页
  • 作者

    Steve Blankinship;

  • 作者单位

    By Steve Blankinship, Associate Editor;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 13:45:26

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号