首页> 外文期刊>Power Engineering >Ensuring Safe and Reliable Operation of High Energy Piping
【24h】

Ensuring Safe and Reliable Operation of High Energy Piping

机译:确保高能管道的安全可靠运行

获取原文
获取原文并翻译 | 示例
       

摘要

In the mid-1980s the power industry experienced high energy piping (HEP) system failures that resulted in personnel injuries and fatalities, as well as damaged equipment and loss of power generation. Power industry leaders worked together with the Electric Power Research Institute and the Materials Property Council to study HEP failures, to understand the causes and to develop resources for avoiding future failures. At that time, experience revealed that construction code criteria and available applications of non-destructive testing methods (NDE) could not provide relevant information regarding failure mechanisms. PacifiCorp has actively managed HEP since the mid-1980s. In 2007, PacifiCorp renewed its commitment to effectively manage HEP. The foundation of PacifiCorp's new HEP program is a document entitled "The PacifiCorp High Energy Piping Safety and Reliability Program". A power company's insurability, deductibles and pricing for boiler/machinery insurance are determined by risk ratings.
机译:在1980年代中期,电力行业经历了高能管道(HEP)系统故障,导致人员伤亡,设备损坏和发电中断。电力行业的领导者与电力研究所和材料财产理事会共同研究了HEP故障,了解了原因并开发了避免将来发生故障的资源。当时的经验表明,建筑规范标准和无损检测方法(NDE)的可用应用无法提供有关失效机制的相关信息。自1980年代中期以来,PacifiCorp一直积极管理HEP。 2007年,PacifiCorp再次致力于有效管理HEP。 PacifiCorp的新HEP计划的基础是名为“ PacifiCorp高能管道安全性和可靠性计划”的文档。电力公司对锅炉/机械保险的可保险性,自付额和定价由风险等级决定。

著录项

  • 来源
    《Power Engineering》 |2010年第7期|p.68-69|共2页
  • 作者

    Paul Waldrop;

  • 作者单位

    By Paul Waldrop, Principal Engineer, PacifiCorp;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 13:45:11

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号