摘要

When embarking on a major capital project, the facility owner must select a basic strategy for the contracting of the project. Various approaches exist and for good reasons, the choice of the contracting approach could affect the outcome of the project. Turnkey EPC with Firm Price: With this approach, the entire scope is provided by a single contractor on a "turnkey" basis. It is seemingly straightforward: you buy the project as a single item with a known price tag. A multiple contract approach may divide the scope into a few or many contracts. More contracts increase the owner's opportunity to save cost but also increase the owner's risk with respect to project integration. Multiple contracts with firm prices: The contracts for this approach are selected to assign direct contract responsibility to each contractor to manage his scope and responsibility directly. This approach enables the owner to manage cost uncertainty by awarding work no sooner than necessary.
机译:在进行大型基本建设项目时,设施所有者必须为项目的承包选择基本策略。存在各种方法,并且出于充分的原因,选择承包方法可能会影响项目的结果。具有确定价格的总承包EPC:采用这种方法,整个范围由单个承包商在“总承包”的基础上提供。这似乎很简单:您以具有已知价格标签的单个项目购买该项目。多重合同方法可以将范围划分为几个或多个合同。更多的合同增加了业主节省成本的机会,但也增加了业主在项目整合方面的风险。具有确定价格的多个合同:选择此方法的合同是为了将直接合同责任分配给每个承包商,以直接管理其范围和责任。这种方法使所有者可以通过比必要时更早地授予工作来管理成本不确定性。

著录项

  • 来源
    《Power Engineering》 |2011年第3期|p.50-56|共7页
  • 作者单位

    By Joy T. Gloria, William E. Siegfriedt and Andrew Carstens, Sargent & Lundy;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号