首页> 外文期刊>Power Engineering >Total Cost of Ownership and Nuclear Valve Projects
【24h】

Total Cost of Ownership and Nuclear Valve Projects

机译:总体拥有成本和核阀项目

获取原文
获取原文并翻译 | 示例
           

摘要

As the power industry prepares to begin building nuclear power plants again in the US, it is important to apply operating lessons learned to new plant designs to avoid the costly learning curve experienced during the 1980s and 1990s. The lessons from the nuclear island are well understood, documented and applied, but there is less emphasis on the secondary side where components are sometimes referred to as 'commodities.' This includes the pump or valve or instrument that is necessary for operations, but not necessarily engineered for that specific application. These secondary side components can affect the performance and capacity of the plant as easily as those in the primary side of the plant. The relationship between the utility, reactor designer, engineering procurement construction company and supplier must be different in the next round of nuclear construction.
机译:随着电力行业准备在美国再次开始建造核电厂,将经验教训应用到新电厂设计中来避免在1980年代和1990年代经历的昂贵的学习曲线很重要。从核岛上得到的教训已得到很好的理解,记录和应用,但对次级方面的强调较少,次要方面有时将组件称为“商品”。这包括操作所需的泵,阀或仪器,但不一定针对该特定应用而设计。这些次级侧组件可以像工厂初级侧一样容易影响工厂的性能和容量。在下一轮核建设中,公用事业,反应堆设计人员,工程采购施工公司与供应商之间的关系必须有所不同。

著录项

  • 来源
    《Power Engineering》 |2011年第2期|p.46-47|共2页
  • 作者

    Gary Wolski;

  • 作者单位

    By Gary Wolski, Vice President-New Build, Nuclear Division, Curtiss Wright Flow Control;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词