首页> 外文期刊>Power Engineering >Mexico s Combined Cycle Building Boom Relies on Advanced HRSGs
【24h】

Mexico s Combined Cycle Building Boom Relies on Advanced HRSGs

机译:墨西哥的联合循环建设热潮取决于高级HRSG

获取原文
获取原文并翻译 | 示例
       

摘要

Significant reforms to Mexico's Comision Federal de Electricidad (CFE), the state-owned conglomerate that controls the country's power generation and transmission infrastructure, began in 2013. The new electricity market mirror global wholesale markets having unlocked the electricity sector to privatization, foreign investment, and foreign party operations through service contracts. Dr. Fatih Birol, executive director of the International Energy Agency (IEA) commented on its 2016 report on Mexico's energy reform in its Word Energy Outlook series, "This is not a reform, it's a revolution on an unprecedented scale." In September 2015, Mexico's Program for Development of the National Electric System established new market operating rules, particularly with respect to renewables integration.
机译:墨西哥的联邦电力公司(CFE)是控制该国发电和输电基础设施的国有企业,该公司于2013年开始进行重大改革。新的电力市场反映了全球批发市场,这些市场已将电力行业释放为私有化,外国投资,和通过服务合同进行的外方业务。国际能源署(IEA)执行董事法提赫·比罗尔(Fatih Birol)博士在其Word Energy Outlook系列中就其2016年有关墨西哥能源改革的报告发表评论说:“这不是改革,而是前所未有的革命。” 2015年9月,墨西哥国家电力系统发展计划制定了新的市场运营规则,尤其是在可再生能源整合方面。

著录项

  • 来源
    《Power Engineering》 |2018年第5期|18-2022-23|共5页
  • 作者

    RAVI KRISHNAN;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:19:36

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号