首页> 外文期刊>PM Engineer >Seasonal changeover solution for scale in hydronic systems
【24h】

Seasonal changeover solution for scale in hydronic systems

机译:用于水力系统的季节性季节性转换解决方案

获取原文
获取原文并翻译 | 示例
       

摘要

For Jim Cater, project engineer at Pittsburgh-based Combustion Service & Equipment Co., the most reliable way to find effective solutions for his customers is to personally test them. After servicing and repairing equipment from many customers with failed heat exchangers, clogged ECM pumps and blown-out boilers, Cater took matters into his own hands. He wanted to find the cause of these breakdowns and develop long-term solutions to manage the health of commercial hydronic systems.
机译:对于位于匹兹堡的燃烧服务与设备公司的项目工程师Jim Cater来说,为其客户找到有效解决方案的最可靠方法是亲自对其进行测试。在维修和修理了许多因热交换器故障,ECM泵堵塞和锅炉爆裂而导致的客户的设备后,Cater亲自处理了一切。他想找出造成这些故障的原因,并开发长期解决方案来管理商业水力系统的运行状况。

著录项

  • 来源
    《PM Engineer》 |2017年第8期|46-46|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:02:22

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号