首页> 外文期刊>Plutonium >Prototype FBR 'Monju' to Resume Operation after a Long Interval
【24h】

Prototype FBR 'Monju' to Resume Operation after a Long Interval

机译:原型FBR'Monju'在长时间间隔后恢复操作

获取原文
获取原文并翻译 | 示例
           

摘要

The prototype fast breeder reactor (FBR) "Monju," which was closed down due to a sodium leak accident in December 1995, is expected to resume operation by March 2010. Although it had been scheduled to resume operation from February 2009, this was postponed due to malfunctions with the sodium leakage detector and outdoor ventilation duct. The inspection of the sodium leakage detector was completed this February, and repairs on the outdoor air duct were completed this May. In addition, confirmation was made of aseismic safety, and the national government completed its special security inspection.
机译:由于钠漏失事故于1995年12月关闭的原型快速增殖堆(FBR)“ Monju”有望在2010年3月恢复运行。尽管原定于2009年2月恢复运行,但该计划已推迟由于钠泄漏检测器和室外通风管道发生故障。钠泄漏探测器的检查已于今年2月完成,室外风道的维修已于5月完成。此外,确认了抗震安全性,中央政府完成了特别安全检查。

著录项

  • 来源
    《Plutonium》 |2009年第66期|13-13|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号