首页> 外文期刊>Plutonium >Immediately Adopt Measures Whatever They Are for Safety Sendai Nuclear Power Station - Japan's First Reactor to Have Restarted
【24h】

Immediately Adopt Measures Whatever They Are for Safety Sendai Nuclear Power Station - Japan's First Reactor to Have Restarted

机译:立即采取措施,确保安全仙台核电站-日本第一个重启的反应堆

获取原文
获取原文并翻译 | 示例
           

摘要

Satsumasendai is a city located in the northwestern part of the Satsuma Peninsula in Kagoshima Prefecture, on the Kyushu Island of Japan and faces the East China Sea. The city is populated by 99,589 people (at the time of the 2010 Japan Census), which makes it the fourth biggest city in Kagoshima Pref. in terms of population. All sections of the Kyushu Shinkansen bullet train line between Hakata Station and Kagoshi-ma-Chuo Station became operational on March 12, 2011. The Shinkansen takes you from Hakata Station to Sendai Station in Satsumasendai in one hour thirteen minutes in the shortest time. This fully operational Kyushu Shinkansen shortens the "distance" between Hakata and Satsumasendai, and changes both cities "within a commutable distance," if you put it in the words in the Kanto metropolitan area. The first Kuma-moto earthquake of a magnitude of 6.5 and an intensity of 7 on the Japanese seismic scale struck the area at 21:26 on Thursday, April 14, 2016 and derailed an out-of-service Shinkansen train, which suspended entire Kyushu Shinkansen service for a while. The Shinkansen service was restored in all sections two weeks later on Wednesday, April 27, 2016. Aftershocks are expected to continue for a while, and there are many challenges in the region's restoration and reconstruction. However, news of restoration of the Kyushu Shinkansen indeed elated people in Kumamoto and Oita Pref.s, and entire Kyushu.
机译:萨摩森台市位于日本九州岛的鹿儿岛县萨摩半岛西北部,面朝东中国海。该城市人口达99,589人(在2010年日本人口普查时),是鹿儿岛县的第四大城市。就人口而言。 2011年3月12日,九州新干线子弹头列车在博多站与神乐町之间的所有路段开始运营。新干线在最短的一小时十三分钟内,将您从博多站带到萨摩森代的仙台站。全面运营的九州新干线缩短了博多与萨摩萨代台之间的“距离”,并且在关东都市圈一词中将这两个城市“在可交换距离内”更改。 2016年4月14日,星期四,日本地震规模为6.5级,强度为7级的第一次熊本地震袭击了该地区,并使新干线列车停止运营,使整个九州停运了新干线服务一段时间。两周后的2016年4月27日,星期三,新干线的所有部分均得到恢复。余震预计将持续一段时间,该地区的恢复和重建面临许多挑战。但是,恢复九州新干线的消息确实使熊本县和大分县的人们以及整个九州人兴高采烈。

著录项

  • 来源
    《Plutonium》 |2016年第84期|15-28|共14页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号