首页> 外文期刊>Plumbing Engineer >Cramped Mechanical Room Spurs Switch to Multi-Unit Tankless Water Heating System for 130-room Hotel Project
【24h】

Cramped Mechanical Room Spurs Switch to Multi-Unit Tankless Water Heating System for 130-room Hotel Project

机译:拥挤的机械室马刺转换为130个房间的酒店项目的多单元无罐热水系统

获取原文
获取原文并翻译 | 示例
           

摘要

When the original boiler spec proves unworkable, hotel ownership switches to a 93°/o-efficient condensing tankless solution to save both space and fuel costs. With inputs up to 3.4 million BTU per hour, this 17-unit system uses an innovative common-venting approach to minimize exterior wall penetrations. Florence, Ala. - The space-saving advantages of tankless water heating recently came into critical play at a 130-room hotel renovation project in Florence, Alabama. The original specification for the Florence Residence Inn by Marriott called for a pair of 750-gallon, 750,000 BTU per hour (BTU/h) boilers, each measuring roughly five feet by 12 feet.
机译:当原始锅炉规格被证明不可行时,酒店所有权将转换为93°/ o效率的冷凝式无罐解决方案,以节省空间和燃料成本。这个由17个单元组成的系统每小时可提供高达340万BTU的输入量,采用了创新的通用通风方法,以最大程度地减少外墙的渗透。阿拉巴马州佛罗伦萨市-最近,阿拉巴马州佛罗伦萨市拥有130个房间的酒店翻新项目中,节省空间的水箱加热优势发挥了至关重要的作用。万豪佛罗伦萨公寓酒店的原始规格要求使用一对750加仑,每小时750,000 BTU每小时(BTU / h)的锅炉,每个锅炉的尺寸约为5英尺乘12英尺。

著录项

  • 来源
    《Plumbing Engineer》 |2011年第7期|p.52|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号