首页> 外文期刊>Inside NRC >IG audit says improvements needed in NRC power uprate program
【24h】

IG audit says improvements needed in NRC power uprate program

机译:IG审计说,NRC电源升级计划需要改进

获取原文
获取原文并翻译 | 示例
           

摘要

NRC staff's understanding of power uprate inspection procedures is "inconsistent," and "the written quality of power uprate safety evaluations needs improvement," the agency's Office of the Inspector General said last month in an audit report. Executive Director for Operations Luis Reye accepted most of the OIG's recommendations for improvement but said the power uprate program is "strong, safe anc very successful." In its March 28 report, OIG said that NRC staff has "an inconsistent understanding of the power uprate inspection procedure's use, implementation, and documentation" because the procedure, IP 71004, lacks guidance on those issues. This "results in stakeholders being unable to adequately monitor power uprate inspections," it said.
机译:NRC的监察长办公室在上个月的一份审计报告中说,NRC员工对电力升级检查程序的理解“不一致”,并且“电力升级安全评估的书面质量需要改进”。运营执行总监路易斯·雷伊(Luis Reye)接受了OIG的大部分改进建议,但表示功率提升计划“非常强大,安全且非常成功”。 OIG在3月28日的报告中表示,NRC工作人员“对功率升级检查程序的使用,实施和文档有不一致的理解”,因为IP 71004程序在这些问题上缺乏指导。它说:“这导致利益相关者无法充分监视电源升级检查。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号