首页> 外文期刊>Inside NRC >China’s UK HPR1000 design completes first step of design review
【24h】

China’s UK HPR1000 design completes first step of design review

机译:中国的英国HPR1000设计完成了设计审查的第一步

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The first step of the UK’s generic design assessment process for China’s UK HPR1000, also known as the Hualong One, has been completed, the Office for Nuclear Regulation and the Environment Agency said in a joint statement November 16. The regulators said that they will interact during the assessment with France’s EDF and General Nuclear System Ltd., or GNS, a UK joint venture company owned by China General Nuclear Power Corp., or CGN. CGN and EDF plan to build a two-reactor nuclear plant at Bradwell in Essex using the UK HPR1000 technology. CGN would own 66.5% in the proposed Bradwell plant and EDF will own 33.5%. The start of the actual reactor assessment process in step 2 of the GDA follows the preparatory work by GNS and the regulators that comprises step 1 of the GDA process.
机译:核监管办公室和环境署在11月16日的联合声明中说,针对中国的英国HPR1000(也称为“华龙计划”)的英国通用设计评估程序的第一步已经完成。在与法国EDF和通用核系统有限公司(GNS)进行评估时,该公司由中国通用核电公司(CGN)拥有的英国合资公司。 CGN和EDF计划使用英国HPR1000技术在埃塞克斯郡的布拉德威尔(Bradwell)建造一座两反应堆核电站。中广核集团将在拟建的布拉德威尔工厂中拥有66.5%的股份,而法国电力公司将拥有其33.5%的股份。 GDA步骤2中实际反应堆评估过程的开始是在GNS和包括GDA过程步骤1的监管机构的准备工作之后进行的。

著录项

  • 来源
    《Inside NRC》 |2017年第24期|4-4|共1页
  • 作者

    Oliver Adelman;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号