首页> 外文期刊>Inside NRC >PG&E considering appealing NRC’s white finding at Diablo Canyon-2
【24h】

PG&E considering appealing NRC’s white finding at Diablo Canyon-2

机译:PG&E考虑对NRC在暗黑破坏神峡谷2中的白人发现提出上诉

获取原文
获取原文并翻译 | 示例
           

摘要

Pacific Gas & Electric is considering appealing a final white findingrnNRC issued December 28 for what the agency said was the utility’srnfailure to adequately maintain the emergency core cooling system atrnDiablo Canyon-2, according to a PG&E spokesman.rnBlair Jones said in a January 3 email that “in the unlikely event thisrnsystem were needed, our professional operators, who continually trainrnand drill to meet any potential emergency, would have successfullyrnresponded to ensure the equipment met its function.” He added thatrnredundant sources of cooling also were available.
机译:PG&E发言人表示,太平洋天然气和电力公司(Pacific Gas&Electric Electric)正在考虑对12月28日发布的最终白色调查结果进行核查,NRC称该公用事业公司未能充分维护应急核心冷却系统at暗黑破坏神峡谷2(Diablo Canyon-2)。rn布莱尔·琼斯(Blair Jones)在1月3日说。电子邮件中说:“在极少数情况下需要该系统的情况下,我们的专业操作人员会不断地进行训练和演练,以应付任何潜在的紧急情况,他们将成功响应以确保设备达到其功能。”他补充说,也有多余的冷却源。

著录项

  • 来源
    《Inside NRC》 |2017年第1期|4-4|共1页
  • 作者

    Elaine Hiruo;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号