首页> 外文期刊>Inside NRC >Construction request for French waste repository expected in 2021: Andra
【24h】

Construction request for French waste repository expected in 2021: Andra

机译:建筑申请法国废物库预计在2021年:安德拉

获取原文
获取原文并翻译 | 示例
           

摘要

A request for permission to start construction of the Cigeo repository inFrance for disposal of high- and intermediate-level waste will besubmitted to the government for approval in 2021, director general of theAndra, the organization in charge of building the facility, said Nov. 12.Pierre-Marie Abadie spoke in Paris during a webinar organized bythe pro-nuclear non-governmental organization Entretiens Europeens.The total cost of the Cigeo project is estimated to be aroundEur25 billion ($29.07 billion), Abadie said. He noted that therepository will be constructed incrementally over 120 years as morewaste is generated and requires disposal space.
机译:启动Cigeo存储库的允许权限请求法国处理高中和中级废物将是提交政府批准于2021年,总干事12月12日表示,安德拉建立该设施的组织。Pierre-Marie Abadie在一个由...组织的网络研讨会期间在巴黎发言私人核不政府组织Entretiens欧洲人。估计Cigeo项目的总成本估计为周围阿巴迪说,EUR250亿欧元(290.7亿美元)。他指出了存储库将逐步构建超过120年废物是生成的,需要处理空间。

著录项

  • 来源
    《Inside NRC》 |2020年第24期|8-8|共1页
  • 作者

    Oliver Adelman;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号