首页> 外文期刊>Inside NRC >NRC issues confirmatory order to APS on Palo Verde dry storage issues
【24h】

NRC issues confirmatory order to APS on Palo Verde dry storage issues

机译:NRC在Palo Verde干寄存问题上发出确认订单到APS

获取原文
获取原文并翻译 | 示例
           

摘要

NRC has issued a confirmatory order to Arizona Public Service Co. inconnection with two apparent violations involving dry cask storage atits three-unit Palo Verde plant, but no notice of violation will be issuedor civil penalty levied if the company implements agreed-uponimprovements, NRC said Nov. 17.NRC said in a letter to APS that the apparent violations involved thefailure to perform a written evaluation for a change to a dry caskstorage system used for spent nuclear fuel and obtain a licenseamendment for the way accident calculations were performed. Theagency said APS had also failed to adequately analyze theconsequences of a hypothetical accident involving a cask tip-over onthe independent spent fuel storage installation pad.
机译:NRC向亚利桑那州公共服务公司发出了确认订单与涉及干桶储存的两个明显违规的连接它的三个单位帕洛佛得角植物,但没有违反通知将发出如果公司实施商定,则征收民事罚款NRC提出了改进11月17日。NRC在一封信中表示,涉及明显的违规行为未能对干式桶进行改变的书面评估用于花费核燃料并获得许可证的储存系统进行事故计算的修正案。这代理商表示,APS也未能充分分析一个假设事故的后果涉及桶的脚步独立的花费燃料储存安装垫。

著录项

  • 来源
    《Inside NRC》 |2020年第24期|5-5|共1页
  • 作者

    Michael McAuliffe;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号