首页> 外文期刊>Inside NRC >NRC completes environmental review of license renewal for Exelon's Peach Bottom
【24h】

NRC completes environmental review of license renewal for Exelon's Peach Bottom

机译:NRC完成了Exelon桃底许可证更新的环境审查

获取原文
获取原文并翻译 | 示例
           

摘要

Environmental impacts from the continued operation of ExelonGeneration's Peach Bottom plant in Pennsylvania are not significantenough to prevent NRC from renewing the plant's operating licensesfor an additional 20 years, the agency said in a statement January 27.Exelon applied in July 2018 to renew the operating licenses for thePeach Bottom-2 and -3 boiling water reactors. The current licenses forthe two units, which have a combined capacity of 2,730 MW, expire inAugust 2033 and July 2034, respectively.
机译:该机构在1月27日的一份声明中表示,ExelonGeneration在宾夕法尼亚州的Peach Bottom工厂的持续运营对环境的影响并不足以阻止NRC将工厂的营业执照再续20年.2018年7月,Exelon申请续签该工厂的营业执照。 The Peach Bottom-2和-3沸水反应堆。这两个装机容量为2,730 MW的当前许可证分别在2033年8月和2034年7月到期。

著录项

  • 来源
    《Inside NRC》 |2020年第3期|3-3|共1页
  • 作者

    Steven Dolley;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号