首页> 外文期刊>Pipeline & gas journal >UGI Gets Aggressive With Pipeline Replacement Program
【24h】

UGI Gets Aggressive With Pipeline Replacement Program

机译:UGI的管道更换计划激进

获取原文
获取原文并翻译 | 示例
       

摘要

In some ways UGI Utilities is fortunate to be so far ahead of the game when it comes to infrastructure replacement. The natural gas distributor, which serves 600,000 customers in 45 eastern and central Pennsylvania counties and one county in Maryland, has about 86% of its 12,000 miles of pipeline already constructed of contemporary materials. Still, that leaves about 1,200 miles of bare steel and 350 miles of cast-iron infrastructure to replace throughout the region's challenging terrain, often facing brutal weather. "All the cast-iron in our system will be replaced by February 2027, and the bare steel pipe in the UGI system will be replaced by 2041," said Bob Krieger, UGI vice president of operations. "We are on an aggressive schedule for getting that pipe out of the ground, without question."
机译:在某些方面,UGI Utilities在基础架构更换方面遥遥领先于游戏。天然气分销商为宾夕法尼亚州东部和中部45个县和马里兰州的一个县的60万客户提供服务,其12,000英里的管道中约有86%已使用现代材料建造。尽管如此,仍有大约1200英里的裸钢和350英里的铸铁基础设施取代了该地区充满挑战的地形,常常面临着残酷的天气。 UGI运营副总裁Bob Krieger说:“我们的系统中的所有铸铁将在2027年2月之前更换,而UGI系统中的裸钢管将在2041年之前更换。” “我们正按照积极的时间表毫无疑问地将那根管道拔地而起。”

著录项

  • 来源
    《Pipeline & gas journal》 |2014年第11期|54-56|共3页
  • 作者

    Michael Reed;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:17:06

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号