首页> 外文期刊>Pipeline & gas journal >Overcoming Pitfalls Of Pipeline Integrity Installations In Russia
【24h】

Overcoming Pitfalls Of Pipeline Integrity Installations In Russia

机译:克服俄罗斯管道完整性设施的陷阱

获取原文
获取原文并翻译 | 示例
       

摘要

PIMS is the process of managing pipeline operational risk and mitigating it effectively to ensure pipeline assets are maintained in safe and reliable condition. Pipeline standards and regulations in Russia are increasingly requiring operators to use risk management. The use of QRA for the safety evaluation of pipelines is now accepted practice in Russia and it is used at the design stage of major pipeline projects. In the case of two key Russian gas and petrochemical companies, despite the differences in detail, both PIMS projects are driven to improve the accuracy of pipeline integrity estimations, and to justify decisions based on these through wider application of quantitative methods for analysis and evaluation of operational risk. The PIMS systems were implemented and successfully tested. As a result similar systems are now being deployed by other companies.
机译:PIMS是管理管道运营风险并有效缓解它的过程,以确保管道资产保持在安全可靠的状态。俄罗斯的管道标准和法规越来越要求运营商使用风险管理。 QRA在管道安全性评估中的使用现已在俄罗斯被接受,并且已在大型管道项目的设计阶段使用。对于俄罗斯的两家主要天然气和石化公司而言,尽管在细节上有所不同,但两个PIMS项目都旨在提高管道完整性估算的准确性,并通过更广泛地应用定量方法进行分析和评估来证明基于这些决策的合理性。操作风险。 PIMS系统已实施并成功测试。结果,其他公司现在正在部署类似的系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号