首页> 外文期刊>Pipeline & gas journal >Pipeline Stations: From Pre-Commissioning to Start-Up
【24h】

Pipeline Stations: From Pre-Commissioning to Start-Up

机译:管道站:从试运行到启动

获取原文
获取原文并翻译 | 示例
       

摘要

Commissioning involves the use of a disciplined, systematic methodology to convert the constructed compressor station into an integrated and operational unit within a gas transmission system. This process should be implemented in a safe and efficient manner within a defined time-frame and budget. The successful operation of a compressor station strongly depends on the quality of three stages of the commissioning: pre-commissioning, core commissioning and start-up. New guidelines, latest lessons learned and modern practical notes must be addressed.
机译:调试涉及使用有纪律的系统方法,将已构造的压缩机站转换为气体传输系统中的集成且可运行的单元。此过程应在定义的时间范围和预算内以安全有效的方式实施。压缩机站的成功运行在很大程度上取决于调试的三个阶段的质量:预调试,核心调试和启动。必须解决新的准则,最新的经验教训和现代实践笔记。

著录项

  • 来源
    《Pipeline & gas journal》 |2015年第10期|60-62|共3页
  • 作者

    Amin Almasi;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);美国《化学文摘》(CA);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:16:51

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号