首页> 外文期刊>Physics in Perspective >The National Synchrotron Light Source, Part II:The Bakeout
【24h】

The National Synchrotron Light Source, Part II:The Bakeout

机译:国家同步加速器光源,第二部分:烘烤

获取原文
获取原文并翻译 | 示例
           

摘要

This is the second part of a two-part article about the National Synchrotron Light Source (NSLS), the first facility designed and built specifically for producing and exploiting synchrotron radiation. The NSLS,a $24-million project conceived about 1970 and officially proposed in 1976, had its groundbreaking in 1978. Its construction was a key episode in Brookhaven’s history, in the transition of synchrotron radiation from a novelty to a commodity, and in the transition of synchrotron-radiation scientists from parasitic to autonomous researchers. In this part I cover the construction of the NSLS.The story of its construction illustrates many of the tensions and risks involved in building a large scientific facility in a highly politicized environment: risking a facility’s quality by underfunding it versus asking for more funding and risking not getting it; focusing on meeting time and budget promises that risk compromising machine performance versus focusing on performance and risking cancellation; and the pros and cons of a pragmatic versus an analytic approach to commissioning.
机译:这是有关国家同步加速器光源(NSLS)的两部分文章的第二部分,国家同步加速器光源是第一个专门设计和建造的用于产生和利用同步加速器辐射的设施。 NSLS是一项耗资2400万美元的项目,构想于1970年,并于1976年正式提出。该项目于1978年破土动工。它的构造是布鲁克海文历史上的关键事件,在同步加速器辐射从新奇到商品的过渡以及过渡中,从寄生虫到自主研究者的同步辐射科学家。在这一部分中,我介绍了NSLS的构建,其构建过程的故事说明了在高度政治化的环境中构建大型科学设施所涉及的许多紧张局势和风险:通过为设施筹资不足而冒险,而不是寻求更多资金和风险来冒险不明白专注于满足时间和预算的承诺会危及机器性能,而专注于性能和取消风险;以及实用的与分析的调试方法的利弊。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号