首页> 外文期刊>PC Quest >ERP Project
【24h】

ERP Project

机译:ERP项目

获取原文
获取原文并翻译 | 示例
           

摘要

This company operates in 4 districts in AP in rural environments. Among the challenges they faced were issues related to network/connectivity, low IT skills among the end users, poor response times for experts to attend to any issues because of remote locations, etc.rnSCCL legacy system architecture was distributed and there were several platforms on which applications were developed. Integration between various functions and various locations was achieved by manual intervention that involved lots of duplicate data entry.
机译:该公司在农村地区AP的4个地区运营。他们面临的挑战包括与网络/连接性相关的问题,最终用户中的IT技能低下,专家因远程位置而无法解决任何问题的响应时间短等问题。rnSCCL遗留系统体系结构已分布并且有多个平台开发了哪些应用程序。各种功能和不同位置之间的集成是通过人工干预实现的,其中涉及大量重复数据输入。

著录项

  • 来源
    《PC Quest》 |2010年第6期|P.52|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号