首页> 外文期刊>Optimization and Engineering >Distribution line downsizing based on a set of non-dominated solutions for a network reconfiguration problem of an electric distribution system with many objectives
【24h】

Distribution line downsizing based on a set of non-dominated solutions for a network reconfiguration problem of an electric distribution system with many objectives

机译:基于一组非主导解决方案的分销线尺寸,用于具有许多目标的电气分配系统的网络重新配置问题

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

To provide electric power supply to consumers even in abnormal situations, the equipment used in electric distribution systems, including distribution lines, have sufficient capacity margins. Maintenance and/or replacement of these lines involving network reconfigurations are routinely performed. Since the monetary costs of equipment investments are significant, downsizing the equipment is important from the standpoint of cost savings. In this paper, we propose a method to downsize distribution lines while maintaining the feasibility of the network reconfigurations. The proposed method consists of three steps. First, (1) sets of non-dominated solutions approximating the Pareto fronts of the network reconfiguration problems are found by a many-objective evolutionary algorithm. Second, (2) the distribution system operator specifies the preferred solutions among the sets found in (1). Finally, (3) a set of downsized lines is chosen from among the set of lines under the condition that the specified reconfiguration procedures remain feasible even after downsizing the lines. A computational experiment using a large-scale distribution system model demonstrates that the proposed method successfully identifies within a practical computational time those distribution lines that provide possibilities for downsizing and their downsized capacities.
机译:即使在异常情况下为消费者提供电力供应,即在异常情况下,配电系统中使用的设备,包括分配线,容量利润率足够。常规执行涉及网络重新配置的这些线路的维护和/或更换。由于设备投资的货币成本很大,从成本节省的角度来看,设备缩小化是重要的。在本文中,我们提出了一种在保持网络重新配置的可行性的同时减少分配线的方法。所提出的方法由三个步骤组成。首先,通过许多客观的进化算法发现近似网络重新配置问题的帕累托前部的非主导解决方案的组。其次,(2)分配系统运算符指定(1)中发现的集合中的首选解决方案。最后,(3)在规定的重新配置过程即使在缩小线条之后,指定的重新配置过程仍然可行的条件下,从一组线中选择了一组缩小线。使用大规模分配系统模型的计算实验表明,所提出的方法在实用的计算时间内成功地识别这些分配线,这些分销线提供缩小化和其缩小的容量的可能性。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号