首页> 外文期刊>Optimization and Engineering >Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm
【24h】

Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm

机译:市场驱动的代工厂中的生产调度:数学编程方法与项目调度元启发式算法

获取原文
获取原文并翻译 | 示例
           

摘要

This paper describes a real problem in a market-driven medium sized foundry delivering a wide range of castings to different markets. The problem consists of finding an efficient production plan to schedule the different processes (moulding, furnacing, cutting, tooling, etc.) needed to the manufacture of the pieces. Different objectives and resources and technical constraints must be taken into account. To solve this problem we have first developed a more classical integer linear programming approach based on a rolling horizon strategy. The most innovative contribution of the paper is that it models the problem as a project scheduling problem. Based on this model we present a metaheuristic algorithm that adapts techniques from the area. Computational experiments comparing both approaches are provided on instances created by a generator simulating real instances.
机译:本文描述了一个市场驱动的中型铸造厂的实际问题,该铸造厂向不同的市场提供各种铸件。问题在于找到有效的生产计划,以计划零件制造所需的不同过程(模制,熔炉,切割,加工等)​​。必须考虑不同的目标,资源和技术限制。为了解决这个问题,我们首先开发了一种基于滚动视野策略的更为经典的整数线性规划方法。本文最具创新性的贡献是将问题建模为项目计划问题。基于此模型,我们提出了一种适用于该领域技术的元启发式算法。在由生成器模拟真实实例创建的实例上提供了将两种方法进行比较的计算实验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号